Table 4.5.3.2.1. Site Infrastructure Requirements and Changes for Stockpile Management Alternatives at Pantex Plant
Alternative Electrical Fuel
Energy (MWh/yr) Peak Load (MWe) Liquid (L/yr) Gas (m3/yr) Coal (t/yr)
Current Resources (1994)
    84,420 1
13.6 2 1,775,720 14,600,000 3 NA
No Action (2005)
     
       
Total site requirement
    46,266
10 795,166 7,200,000 NA
Change from current resources
    -38,154
-3.6 -980,554 -7,400,000 NA
Downsize Weapons Assembly/Disassembly and High Explosives Fabrication
     
       
Total site requirement
    46,250
11 795,600 7,650,000 NA
Change from No Action
    -16
1 434 450,000 NA
Downsize Weapons Assembly/Disassembly
     
       
Total site requirement
    43,000
10 740,000 7,150,000 NA
Change from No Action
    -3,266
0 -55,166 -50,000 NA
Phaseout Weapons Assembly/Disassembly and High Explosives Fabrication
     
       
Total site requirement
    0
0 0 0 NA
Change from No Action
    -46,266
-10 -795,166 -7,200,000 NA


1 System capacity is 201,480 MWh/yr. 2 System capacity is 22.5 MWe. 3 System capacity is 289,000,000 m3/yr.
Note: NA - not applicable.
Source: PX 1995a:2; PX 1996e:1; PX DOE 1995g; PX DOE 1996b; PX MH 1995a.